František Coal Mine (Czech Republic)

  • Closed mine in the Ostrava region
  • Project of Green Gas DPB
  • Construction begun in Aug 08, operational in Dec 08
  • Project generating heat and electricity
  • 3 CHP plants - installed capacity:
  • 2 CHP x 1.6 MWel (gas consumption 6 mln m3 /annum)
  • 1 CHP x 1.2MWel (gas consumption 2.3 mln m3 /annum)  
  • Largest site of the 'Green Gas DPB 40 MWel' project - 3 out of 18 CHP plants in Frantisek
  • 'Green Gas DPB 40 MWel' includes construction of 30 CHP plants (2005 to 2012) of total capacity of 40 MWel 
  • 18 CHP plants already constructed and operational at 22.2 MWel  total capacity. 

 